Project Support

Installation Requirements

A reliable result depends on verified glass conditions, a controlled work area, correct electrical planning and qualified local installers.

Before Installation

Verify the Glass

Confirm glass type, thickness, panel dimensions, edge condition, coatings and whether the project uses existing or new glazing.

Prepare the Site

Provide a clean, dry and controlled work area appropriate for precision film or glazing work.

Plan Power & Controls

Confirm the control method, controller location, cable route and access for qualified electrical work.

Responsibility Matrix

TaskResponsible party
Final field measurements and glass inspectionCustomer / local glazing professional
Local code and electrical complianceLicensed local electrician / contractor
Installation method and workmanshipQualified local installer
Product-route and supplier-document reviewGlaziVue remote project support
Final purchase approvalCustomer / project team

Information Needed for Review

  • Project city and country
  • Existing glass or new construction
  • Panel-by-panel width and height
  • Approximate total area
  • Photos of glass, frames and access conditions
  • Desired switching method and project timeline
Do not order from rough estimates alone. Final dimensions and site suitability must be verified locally before production or cutting.
WhatsApp Project Inquiry